Product Description
I. Factories
1. Binh Phuoc Plant
Location: Thanh Binh Hamlet, Thanh Luong Commune, Binh Long Town, Binh Phuoc, VietNam ( Dong Nai, Vietnam).
Manufacturing Capacity: 1.45 million tons of cement/year – 2.1 million tons of clinker/year.
Clinker production plant with on-site supply and Phu Huu & Cam Ranh grinding terminal
Technology: The most modern closed production chains of POLYSIUS (Germany), ABB (Switzerland), LOESCHE, AND HAVER BOECKER (Germany), adhering to European standards to minimize dust emissions.
Loading Capacity (Road): Roadway: 9.000 tons of cement/day.
2. Phu Huu Grinding Terminal
Location: Unit 8, Block 4, Phu Huu Ward, District 9, HCMC, VietNam( Ho Chi Minh City,Vietnam).
Manufacturing Capacity: 2.6 million tons of cement/year
Technology: The most modern technology supplied by LOESCHE and HAVERBOECKER(Germany), ABB (Switzerland)
Loading Capacity: Waterway: 4,000 tons of cement/day & Roadway: 5,000 tons of cement/day
II. Product identification & specification of cement :
No | Product name | Product description | Product identification | UN CPC code: |
1 | Vicem Ha Tien masonry cement
|
Vicem Ha Tien Masonry Cement is conforms to Vietnam Standard TCVN 9202 : 2012, this kind of cement is primarily used in masonry and plastering construction with outstanding properties: Primarily used in Masonry and Plastering construction | TCVN 9202:2012 MC25, BS 5224:1995, EN 197-5 – CEMVI(S-L)32,5R | 37440 |
III. Technical Specifications:
Parameter | Unit | Cement PCB |
SO3 | % | 1.85 |
LOI | % | 1.85 |
IR | % | 1.85 |
Blaine | cm2/g | 4780 |
Initial setting time | min. | 170 |
Final setting time | min. | 200 |
3D Strength | Psi | 2375 |
28D Strength | Psi | 2375 |
Data Source: EPD Reporting